---
title: "Technical debt assessment: map and priorities | QMates"
source: https://qmates.tech/en/services/engineering-transformation/technical-debt-assessment
description: "Our technical debt assessment reads your code, change history and release flow, and hands you a map of the areas slowing your product down, ranked."
updated: 2026-11-21
---

Technical Debt Assessment

# Technical debt assessment: find the debt that slows you down, and the debt you can leave alone

In a technical debt assessment we read the code, the change history and the way your team works alongside you. You get a map of the areas that hold back your important changes, and the order in which to tackle them.

About 4 weeks, with the first map of critical areas by week two or three

## Every codebase carries debt, and usually nobody can say which debt is costing you

A technical debt assessment is a roughly four-week analysis of your code and the way your team works. It ends with a map of critical areas, ordered by how much each one slows the changes that matter to the business, and a 90- and 180-day action plan. It matters because technical debt isn't messy code waiting to be tidied – it's friction, and it makes the very changes that deliver value slower and riskier. Until you can see where it concentrates, every conversation about what to fix stays generic.

Debt always loses out to features because nobody can say what it costs, and debates about what to refactor end in competing opinions

You have a static analysis report with hundreds of findings and no way to rank them

There is talk of rewriting everything, and nobody can say what would be lost: the business rules buried in old code, the edge cases fixed one at a time over the years, the integrations that work although nobody remembers why

A new CTO has arrived and needs to understand the state of the system before deciding anything

What they have in common is that nobody has yet looked at the system as a whole

## What we analyse, in the code and in the way you work

The assessment examines technical debt in your real code, together with the people who change it every day. Analysis tools help us find the places worth a closer look; our conclusions come from reading those places with your team.

### Change history and hotspots

From version control we work out which parts change most often and which are most complex. Where the two overlap, you pay the debt on every change.

### Coupling and module boundaries

We count how many modules a typical feature has to touch. When the number is high, there is usually an unclear boundary multiplying both the work and the chances of regression.

### Testability and the test safety net

We read the existing tests to see what behaviour they really pin down, since the coverage percentage alone says little, and we mark the parts where code is being changed today with no safety net.

### Pipeline and release flow

We follow a change on its way to release and look at where it sits waiting, whether that is a slow build or a manual check.

### Dependencies and libraries

Pinned versions, unmaintained libraries, upgrades put off because nobody knows what would break.

### Interviews with the team and product leads

Change history shows where the code moves, and says nothing about what the product is waiting for. So we talk to the developers and to whoever leads the product, and ask which features are stuck and where the work meets the most friction.

## How it works

There are five phases, and the first map of critical areas arrives before the final presentation, so we can go through it with you while there is still time to dig deeper.

1.  01

    ### Access and preparation

    We agree the scope, get access to the repository and schedule interviews with the right people.

2.  02

    ### Repository analysis and interviews

    We analyse the change history, the structure of the code and the tests, and meanwhile talk to the team and to whoever looks after the product to understand where the work slows down.

3.  03

    ### Expert analysis

    We go through the critical areas with your developers and compare the data with what really happens. This is where the first map takes shape.

4.  04

    ### Map and plan

    We assign an action to each area and build the action plan, starting with the areas that hold back your roadmap.

5.  05

    ### Final presentation

    We present the map, the plan and an executive summary to the CTO and management, and answer questions from the people who have to decide.

### Two formats, chosen to fit your system

About 4 weeks

#### Standard format

For most products. The first map of critical areas arrives by the second or third week, and the final presentation in the fourth.

Up to 2 months

#### In-depth format

For large codebases or distributed teams. We observe more release cycles and a longer change history, because in systems like these debt only shows over time.

## What you receive

### The debt map, with priorities

Every critical area with its risk, change frequency, business impact and one of four actions, in the order we would tackle them.

### An executive summary for management

A document that turns the debt into consequences for the roadmap, for the people who have to decide without reading the code.

### A 90- and 180-day action plan

The order in which to take on the areas, including those to leave alone, and the signals to watch to tell whether the plan is working.

## What a debt map looks like

An example, based on the software of a hypothetical e-commerce business. Each row is an area of the system. The columns show how risky it is to touch, how often it is touched and how much it weighs on the business, and the last one says what to do with it.

Area

Risk

Change frequency

Business impact

Action

Shipping management

Every new carrier goes through here, and every change breaks an edge case

High

High

High

Refactor first

ERP integration

Fragile, but it changes only once or twice a year

High

Low

Medium

Contain

Order flow

Changes every sprint, and almost no test describes its behaviour

Medium

High

High

Test, then refactor

Historical reporting

Old, complex code, but stable and away from the growth path

Low

Low

Low

Leave as it is

Illustrative example: the areas and values do not come from a client

Refactor first

Where risk, change frequency and impact add up, every week of waiting costs you

Contain

The area is isolated behind a clear boundary, so its debt doesn’t spread to the rest

Test, then refactor

Where the code changes often but no test pins down its behaviour, characterisation tests describing how it works today come first, then refactoring with a safety net

Leave as it is

Known, stable debt, far from the roadmap: stepping in would cost more than it returns

## The debt you can leave alone

Some of your debt is fine to keep. A complex module that hasn't changed in years and sits away from the growth path costs little as long as it stays still, and refactoring it on principle means spending team time for no return.

That’s why "Leave as it is" is one of the actions on the map, and why the first question we ask about every area is what the next change you have to make there will cost. Knowing what not to touch frees time and attention for the two or three areas that are really holding back your roadmap.

## What this assessment doesn't include

The raw report of a static analysis tool

A judgement on people. Debt almost always comes from sensible decisions, made in a context that has since changed

A rewrite taken for granted

Lock-in to us. The plan is written so that your team can carry it out on its own

Are you evaluating software that isn't yours yet, for an investment or an acquisition? That is a tech due diligence, with different questions and a different timeline. [What is a tech due diligence](https://qmates.tech/en/services/engineering-transformation/technical-debt-assessment/technical-due-diligence)

Is the slowdown about more than the code? The [software delivery assessment](https://qmates.tech/en/services/engineering-transformation/software-delivery-assessment) also looks at practices, process, team organisation and the use of AI.

## After the assessment, three ways forward

The map is worth having even if we never work together again. Which path to take depends on how much debt you have and where it sits, and you decide with the map in front of you.

### Your team takes it from here

When the debt is contained and your team has the time and the skills

Priorities, actions and the signals to watch are already written into the plan, which is designed to be carried out by your own team.

### Targeted Intervention

When a single bottleneck is blocking everything else

A short, focused intervention on that one point, working in the code with your team, without opening a wider programme.

[How Targeted Intervention works](https://qmates.tech/en/services/engineering-transformation/unblock-software-delivery)

### Legacy code refactoring programme

When the debt is widespread and holds the roadmap back on several fronts

An incremental programme of work in your codebase, with no full rewrite. The assessment tells you which approach fits: a small focused team working with your developers when the damage is serious, opportunistic refactoring during development when it is contained.

[How the refactoring programme works](https://qmates.tech/en/services/engineering-transformation/legacy-code-refactoring)

## Where this way of working comes from

This way of reading debt comes from working inside teams as developers, on products that keep growing while the code underneath stiffens. Sitting next to the people who change the code every day, you recognise the fragile points of the architecture by the changes that get stuck, and metrics then help you measure their weight.

The same work taught us to run refactoring inside product development. An area leaves the monolith one feature at a time, with characterisation tests on the parts it touches, while new features keep shipping. The assessment map helps you choose where to start.

[Read the SureVIVE case study](https://qmates.tech/en/case-studies/surevive)

## Frequently asked questions

Do we need to give you access to the code?

Yes, to the repository and its change history. Without the real code the assessment would turn into a questionnaire, and that is exactly what we want to avoid.

How long does it take?

The standard format takes about four weeks, with the first map of critical areas by the second or third. For large codebases or distributed teams there is an in-depth format, up to two months, that observes more release cycles and a longer change history.

Which technologies do you work with?

We are language-agnostic: we work with the stack you have and adopt the technologies your team already uses. Change history, coupling, testability and release flow can be read in any stack.

We already use SonarQube or CodeScene. Do we still need this?

The data from those tools is useful to us, because it shows where the code is complex or changes often. To know which debt weighs on the business, which you can leave alone and in what order to act, you need interviews, a reading of the code with the team and knowledge of the roadmap.

What's the difference between a code audit and a technical debt assessment?

A code audit checks quality against rules and standards and produces a list of problems. A technical debt assessment starts from the same code to work out which debt slows down the changes that matter to the business, and in what order to tackle it, so it cross-references the code with the change history and with interviews with the team. If you are looking for technical debt consulting or an evaluation, this is usually where it starts.

What happens if the debt is everywhere?

It rarely weighs the same everywhere. Usually a few areas concentrate most of the friction, because they are the ones that change most often. The map exists to separate them from the rest and to decide where to start.

Does it make sense before deciding on a rewrite?

That is when it is most useful. A rewrite makes sense in only a few cases, for example technology that no longer gets security updates, or coupling so tight that no part can be isolated. The assessment tells you whether your system is one of those cases, or whether incremental refactoring gets there sooner and with less risk.

How is this different from a tech due diligence?

A tech due diligence is for people evaluating software they don’t own yet, before an investment or an acquisition. A technical debt assessment is for teams that already build their software and want to know where to step in to make it easy to change again.

## Before you commit

### A first conversation

Tell us about your system and what is holding you back, and we will tell you frankly whether an assessment is right for you and in which format. Sometimes the answer is that it isn’t.

### A self-assessment you can run right now

The Consistency Impact Calculator estimates the economic impact of a lack of Consistency between business, team structure and software: a first order of magnitude for what the slowdown is costing you.

[Open the Consistency Impact Calculator](https://qmates.tech/en/consistency-impact-calculator)
