- Home
- Open Innovation
- Validation takes too long
Validation takes too long.Every PoC turns into a mini-project
A proof of concept should answer a question in weeks. Instead, it turns into a project with scope creep, delays and runaway costs.
Signs you'll recognise
If more than one sounds familiar, it isn't a coincidence — it's a pattern.
An effective PoC answers one specific question, quickly. Everything else is scope creep.
Why it happens
PoCs fail through scope creep: you start with a question and end up building a mini-product. The pressure to "show something complete" is strong.
Without success criteria set in advance, a PoC can't be judged objectively. You end up arguing opinions instead of looking at results.
A good PoC has three features: a specific question, measurable success criteria and a strict timebox. Everything else is noise.
Our approach is time-boxed and hypothesis-driven: we define what we want to learn, how we measure it and how much time we allow ourselves.
How we step in
We work inside your organisation, not from the outside. Change happens in the code and in the teams.
Defining the hypothesis
We frame the specific question the PoC needs to answer, and define measurable success criteria before we start.
Minimum scope
We cut the scope down to the bare minimum needed to test the hypothesis, using mocks, stubs and shortcuts wherever possible.
Time-boxed development
We build the PoC in 1–3 weeks with a strict timebox. If it doesn't land in time, that's an important signal in itself.
Evaluation and decision
We evaluate the results against the criteria we set. The go/no-go/pivot decision rests on evidence, not opinions.
What changes afterwards
PoC in 1–3 weeks
Fast answers that drive investment decisions.
Evidence-based decisions
Go/no-go calls based on objective criteria, not opinions.
Controlled costs
The PoC costs a fraction of the full project.
Reusable learning
Every PoC produces documented insight, whatever the result.
Do you recognise these signs in your organisation?
How we can help
The services we use to tackle this kind of problem.
Related problems
These warning signs tend to show up together. Explore the related topics.
Tell us where you're stuck
A fragile prototype, a burdensome legacy codebase or unpredictable delivery: that's where we start